Wednesday, June 15, 2016

Update 6/15/16

A lot has happened since the last update.  I have loads of pictures and a few video clips.  They are still on schedule.  They have mason, cement, plumbing, metal, electrical workers all working at the same time in order to make deadlines.  They are hoping to have it all roofed by winter so they won't have to winterize anything.  Here are the pictures and video clips.  I hope everyone is enjoying their summer!



And here are the most current photos over the past two weeks.
 Prepping for a floor pour
Standing in the gym looking at where the stage will be.
 Kitchen
 More Kitchen
 Standing in one of the 3rd grade rooms looking at the other three.  Above will be 4th grade.
 Prep for floor pour.
 Masons beginning to put walls up for 2nd grade classrooms.
 Looking North.
 I'm on the roof looking at where 4th and 3rd grade will be.
 Hallway between 3rd grade and main downstairs corridor.
 Hallway between 3rd grade and main downstairs corridor.  2nd grade classrooms on the right.
Roof shot of the whole construction scene.